摘要
重庆瑞安天地高层项目建筑造型及建筑功能需要与结构巧妙结合,其中避难层构件制作周期长、构件装配焊接次数多,是整个工程的关键环节,在施工中制定严格的施工工艺。通过对出现的质量问题进行分析研究,采取针对性措施,提高构件制作质量和效率。
The Architecture Form and Function is ingeniously combined with building structure in Chongqing Ruian Tiandi highrise building project. The fabrication period of refuge floor elements is long, the elements should be assembled and welded for more times, it is the key link of production. In order to increase the production quality and efficiency, approrpriate measures have been taken. It analyzed some quality problems for making a strict construction technology.
出处
《江苏建筑》
2012年第B12期48-50,共3页
Jiangsu Construction
关键词
钢结构
腰桁架
装配
焊接工艺
steel structure
middle truss
assembly
welding technology