二氧化碳再生塔双抱杆抬吊就位技术
The Placement Technique for CO_2 Regenerated Tower with Double Derrick Crane Method
摘要
用双抱杆抬吊就位技术对CO_2再生塔的安装方法及过程进行了论述。
Discussion is made on the installation process and method of the placement technique for CO2 regene rated tower with double derrick crane method.
出处
《交通科技与经济》
2000年第2期51-52,共2页
Technology & Economy in Areas of Communications