期刊文献+

新建渝黔铁路关键工程地质问题及地质选线研究 被引量:5

Studies on Key Engineering Geology Issues and Geological Alignment of Newly-built Chongqing-Guiyang Railway
下载PDF
导出
摘要 研究目的:新建渝黔铁路位于重庆市西南部和贵州省北部地区,为一条连接西北、川渝和泛珠三角的干线铁路。渝黔铁路从地势相对较低的四川盆地延伸上云贵高原,穿越川滇褶皱区,地形起伏大,地质构造复杂,遍布各种不良地质及特殊岩土。有必要查清控制渝黔铁路的关键工程地质问题,进行工程地质选线。研究结论:(1)岩溶是本线最大的不良地质体,对工程的危害和影响是巨大的;(2)矿床及采空区是控制渝黔铁路改扩建工程的关键、重大不良地质问题,原则上应尽量绕避这些不易查清的小矿区;(3)区内大的地质构造主要走向为南北向、北东向构造及北北东向,应避免线路走行在顺层延伸的断裂带内,同时应严格控制挖方边坡高度、增加路堑边坡加固、隧道顺层滑动、顺层偏压的工程治理措施;(4)改扩建线路方案应尽可能避免改拆整治病害的建筑物,以免引起地质病害的复活。 Research purposes: The newly -built Chongqing- Guiyang Railway, located in the southwestern Chongqing Municipality and northen Guizhou Province, longitudinally passes through the municipality and province and it is the main railway to connect the northwest China with Sichuan, Chongqing and the Pan - pearl River Delta Zone. As this railway starts from the relatively lower terrain of the Sichuan Basin, stretches to the Yunnan - Guizhou Plateau and crosses the Sichuan- Yunnan folded region, the landforms fluctuate largely, the geologic structure is complicated and the unfavorable geological condition and special rock and soil are found everywhere. So it is necessary to well know the key engineering geology issues for the railway alignment.Research conclusions:( 1 )The karst is the most unfavorable geological object and has huge harm and impact on the railway construction. (2) The major unfavorable geological problems of the mineral deposit and the mined - out area are crucial to the railway construction. The railway should keep away from the small mining areas as much as possible. (3) The major geologic structures of the mining area are the north - south, east - north and north - north structures. The railway also should keep away from the fault zone that stretches along the layer In the meantime, the height of the side slope should be strictly controlled, and the measures of reinforcing the side slope and cutting and preventions of the tunnelg bedding sliding and bias pressure should be taken. (4)The railway lineg expansion program should as much as possible avoid changing or demolishing the building which would cause resurrection of geological disease.
作者 徐正宣
出处 《铁道工程学报》 EI 北大核心 2012年第12期15-20,共6页 Journal of Railway Engineering Society
关键词 渝黔 铁路 工程地质 选线 Chongqing - Guiyang Railway engineering geology alignment
  • 相关文献

参考文献7

二级参考文献9

共引文献150

同被引文献27

  • 1章继树.岩溶地区桥梁工程勘察与设计[J].铁道运营技术,1999,5(3):120-121. 被引量:4
  • 2杨全明,尹明万,李景海.岩溶地区设计洪水计算的探讨[J].水力发电,2005,31(2):13-17. 被引量:8
  • 3湖南省水利水电厅.湖南省暴雨洪水查算手册[M].长沙:湖南科学技术出版社,1984.
  • 4TB 10049-2004,J 339-2004,铁路工程水文地质勘察规程[S].
  • 5TB10012-2007,铁路工程地质勘察规范[S].
  • 6冯建林,徐正宣,索朗,等.改建铁路重庆至贵阳线工程地质报告[R].成都:中铁二院工程集团有限责任公司,2009.
  • 7TB10027-2012铁路工程不良地质勘察规程[S].
  • 8中华人民共和国铁道部.TB10017-99铁路工程水文勘测设计规范[s].北京:中国铁道出版社,1999.
  • 9铁道部第一勘测设计院.汇水面积-流量关系曲线图(壹桥8216)[Z].兰州:铁道部第一勘测设计院,1984.
  • 10许模,冯建林,等.拟建铁路渝黔线凉风垭隧道岩溶水文地质条件[R].成都理工大学,中铁二院地勘岩土工程有限责任公司,2009.

引证文献5

二级引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部