摘要
对张海27-29H水平井水力喷射分段压裂的成功实施,解决了常规分层压裂的井控风险,满足滩海地区油井分段增产措施要求。该技术在大港油田人工岛上成功应用,为大港油田水平井低渗透油藏高效开发探索出新的技术手段。
It solves the controlled well risk of conventional separated fracturing through successful implementation of hydraulic jet separated layer fracturing in Zhanghai27-29H horizontal well,which meets the requirements of oil well stimulation measures in beach area.The successful application of this technology inartificial island of Dagang oilfield explores a new technical way for effective development of horizontal well in low permeability reservoir of Dagang oilfield.
出处
《油气井测试》
2012年第6期60-61,76,共2页
Well Testing
关键词
大港油田
水平井
分段压裂
低渗透油藏
增产措施
Dagang oilfield,horizontal well,staged fracturing,low permeability reservoir,measures of increasing production