摘要
该文以长深公路承德到承唐界段TJ12段安子岭一号隧道工程为依托,对双连拱隧道的施工技术进行了总结。该施工技术,打破常规,勇于创新,在保证安全、质量的前提下,加快了施工进度,突破了施工网络图中的瓶颈制约,并为国家节约了投资,取得了良好的社会效益和经济效益。
Based on Changshen Expressway Chengde - Chengtang TJ12 Section Anziling Tunnel No. 1 Project,the article sums up the construction technology of the double-continuous-arch tunnel.This construction technology breaks the normal procedure and innovates courageously,and under the premise to guarantee the security and quality,speeds up the construction schedule,breaks the bottleneck restriction in the construction network diagram so as to economize the national investment and to achieve the social and economic benefits.
出处
《城市道桥与防洪》
2012年第11期116-118,30,共3页
Urban Roads Bridges & Flood Control
关键词
双连拱
隧道
施工
技术
double-continuous-arch
tunnel
construction technology