分离式桥现浇连续箱梁钢管支架施工方案 被引量:1

Steel Pipe Support Construction Plan of Separation Bridge Castin-place Continuous Box Girder
下载PDF
导出
摘要 文章以陈家田分离式桥现浇连续箱梁满堂钢管支架施工为例,介绍了在山区软质地基上进行现浇预应力连续箱梁满堂钢管支架施工的总体布置方案,并通过支架力学检算验证了施工方案的可行性,同时阐述了支架地基处理、支架装拆及加载预压等施工过程。 With full steel pipe support construction of Chenjiatian separation bridge cast-in- place continuous box girder as an example,the article introduced the general layout plan of cast-in-place prestressed continuous box girder full steel pipe support construction plan in mountain soft base,and verified the feasibility of construction plan through the support me- chanics checking, and described the construction process of support foundation treatment, support assembly and disassembly, and loading prepressing etc..
作者 张坤
出处 《西部交通科技》 2012年第11期26-32,共7页 Western China Communications Science & Technology
关键词 陈家田分离式桥 现浇支架施工 方案验算 Chenjiatian separation bridge~ Cast-in-place support construction Plan checking
  • 相关文献

参考文献2

  • 1杭瑞高速遵义至毕节公路第二十合同段.两阶段施工图设计[z].
  • 2JTG/TF50-2011,公路桥涵施工技术规范[S].

共引文献624

同被引文献3

引证文献1

二级引证文献2