摘要
探讨大型化工建设项目在决策阶段、设计阶段、工程实施阶段全过程的投资控制方法,以笔者最近参与建设的新建800kt/a尿素项目为实例,通过从工艺路线的比选、总体方案优化、加强设计管理、设备材料招标采购、工程造价管理等环节进行有效控制,取得了良好的效果,工程建设投资费用控制在批准的概算范围之内,对类似大型化工建设项目的投资控制具有一定借鉴作用。
The investment controlling method of large chemical engineering construction project was researched at whole process of decision, design and project implementation phase. Taking a new 800000 ton/a urea project for example, all links had been controlled effectively as comparison and selection of process route, overall scheme opti- mization, strengthen design management, equipment and materials procurement,engineering cost management etc, so that the project investment cost had been controlled in the approved budget range. It could be used as reference for investment control of similar large chemical engineering construction project.
出处
《贵州化工》
2012年第6期12-14,共3页
Guizhou Chemical Industry