鸿山热电厂煤码头及引堤工程施工关键技术与控制 被引量:1

Breakwater for Hongshan Thermal Power Plant
下载PDF
导出
摘要 与常规顺岸码头比较,鸿山热电厂煤码头及引堤工程所处海域海况复杂恶劣,施工难度大。针对工程特点,项目部采取施工关键技术及一系列相应的控制措施,克服了恶劣海况,充分利用每个可作业潮水,确保工程顺利完工。 Comparing with conventional wharfs built along shorelines, the wharf and breakwater for Hongshan thermal power plant are located in an area with very poor wave and tidal conditions and are very difficult to construct. The project department uses some key technology and correspondingly takes control measures according to the difficulties, and overcomes the poor weather conditions, and takes use of every tide period suitable for construction, and finally finishes the project on schedule.
出处 《中国港湾建设》 2012年第6期49-52,共4页 China Harbour Engineering
关键词 防波堤码头 关键技术 控制 breakwater wharf key technology control
  • 相关文献

参考文献3

  • 1中交第一航务工程局有限公司.港口工程施工手册[M].北京人民交通出版社,1994.
  • 2JTJ290-98.重力式码头设计与施工规范[S].[S].,..
  • 3JTJ298-98.防波堤设计与施工规范[S].[S].,..

共引文献88

同被引文献5

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部