摘要
与常规顺岸码头比较,鸿山热电厂煤码头及引堤工程所处海域海况复杂恶劣,施工难度大。针对工程特点,项目部采取施工关键技术及一系列相应的控制措施,克服了恶劣海况,充分利用每个可作业潮水,确保工程顺利完工。
Comparing with conventional wharfs built along shorelines, the wharf and breakwater for Hongshan thermal power plant are located in an area with very poor wave and tidal conditions and are very difficult to construct. The project department uses some key technology and correspondingly takes control measures according to the difficulties, and overcomes the poor weather conditions, and takes use of every tide period suitable for construction, and finally finishes the project on schedule.
出处
《中国港湾建设》
2012年第6期49-52,共4页
China Harbour Engineering
关键词
防波堤码头
关键技术
控制
breakwater wharf
key technology
control