复杂环境下建(构)筑物控制爆破拆除的设计与应用 被引量:1

THE DESIGN AND APPLICATION OF CONTROLLED BLASTING DEMOLITION FOR BUILDINGS IN COMPLEX ENVIRONMENT
下载PDF
导出
摘要 结合湖南岳阳某水泥厂厂房控制爆破拆除情况,通过爆破方案及参数的设计,介绍了炸高的选取,以及利用控制爆破多段延时起爆技术的利弊,经过科学的理论计算采取了有效的防护措施降低了爆破危害,并通过爆破测振仪TC-4850测振数据详细分析了爆破拆除过程中的振动情况,为以后相关类似实例提供了宝贵工程经验。 Selection of blasting height and the pros and cons of multistage delay initiating technique by controlled blasting were discussed in detail, through the design of blasting scheme and parameters, and combining with the example of a Yueyang cement plant in Hunan. In addition, the blasting damage was brought down by some effective precautions through the scientific theoretical calculation, and the vibration situation in blasting demolition was analyzed with the data tested by blasting vibration meter TC-4850. It could provide valuable engineering experience for similar engineering.
出处 《工程爆破》 北大核心 2012年第4期67-70,共4页 Engineering Blasting
关键词 建(构)筑物 控制爆破拆除 延时 炸高 爆破测振 Building Controlled blasting demolition Delay Blasting height Blasting vibration test
  • 相关文献

参考文献4

二级参考文献25

  • 1李洪涛,舒大强.爆破震动衰减规律的影响因素[J].武汉大学学报(工学版),2005,38(1):79-82. 被引量:71
  • 2杜郧隆.超深孔控制爆破在宝泉电站路堑开挖中的应用与探讨[J].爆破,2006,23(3):44-47. 被引量:3
  • 3Blair D P, Jiang J J. 1995. Surface vibration due to a vertical column of explosive[J]. Int J Rock Mech Min Sci & Geomech,32: 149~154
  • 4Jimeno C L, Jimeno E L, Carredo A J F. 1995. Drilling and Blsating of Rocks[M]. Rotterdam: A.A. Balkema, 333~364
  • 5Hagan T N, Kennedy B J. 1980. The design of blasting procedures to ensure acceptable noise, air-blast and ground vibrations in surface coal mining. In: Environmental Controls for Coal Mining: First National Seminar, Sydney, Australia, November
  • 6Konya C J, Walter E J. 1985. Rock Blasting[M]. Springfield, Virginia: National Technical Information Service, 232~235
  • 7Linehan P, Wiss J F. 1980. Vibration and air blast noise from surface coal mine blasting. SME-AIME Fall Meeting, Mather W. 1984. Factors affecting magnitude and frequency of blast-induced ground and air vibrations. Transactions of the Institution of Mining and Metallurgy, Section A, 93: 173~180
  • 8Osanloo M G, Bakhshandeh H, Javaherian A. 2000. Prediction of Sarcheshmeh CopperMine blasting operation effects on nearby structure[A]. Mine Planning and Equipment Selection. Athens, Greece, 6~9 November[C]. Rotterdam: A A Balkema, 111~115
  • 9Rathore S S, Akhilesh J. 1988. Successful firing of complex 1,30,000 tones pillar blast at Mochia Mine[J]. Journal of Mines, Metals & Fuels, 7: 381~387
  • 10Roy P P. 1998. Characteristics of ground vibration and structure response to surface and underground blasting[J]. Geotechnical and Geological Engineering, 16: 151~166

共引文献15

同被引文献1

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部