秦岭隧道Ⅰ线中部多工作面钻爆法施工通风系统的研究与实践 被引量:2

Study and Application of Ventilation System during the Construction with Multi-Face Drilling and Blasting Method in the Middle Part of Qinling No. I Tunnel
下载PDF
导出
摘要 结合秦岭特长铁路隧道Ⅰ线中部多工作面钻爆法大规模组织施工特点,研究设计了利用Ⅱ线平导作主风流通道的混合通风系统,对实现秦岭隧道快速施工发挥了重要作用,取得了较好的经济效益和社会效益。 This paper mainly introduces the characteristics of construction with multi - face drilling and blasting method in the middle part of extra long Qinling railway tunnel. Mixed ventilation system with the No. II tunnel as its main ventilation passage was designed for the middle part of Qinling No. I tunnel. This system played an important role in rapid construction of Qinling tunnel and achieved great both economic and social benefits.
出处 《世界隧道》 2000年第4期27-33,共7页
关键词 秦岭隧道 通风系统 钻爆法施工 多工作面 Qinling Tunnel Ventilation System Drilling and Blasting Construction
  • 相关文献

同被引文献7

  • 1崔颖哲.五指山隧道出口工区施工通风[M].,-..
  • 2唐经世.西康铁道秦岭隧道北段I线钻爆法段施工通风[J].筑路机械与施工机械化,1999,4.
  • 3赖涤泉.隧道施工通风与除尘[M].北京:中国铁道出版社,-..
  • 4崔颖哲.[R].,..
  • 5唐经世.西康铁路秦岭隧道北段Ⅰ线钻爆法段施工通风[J].筑路机械与施工机械化,1999,(4).
  • 6赖涤泉.隧道施工通风与除尘[M].北京:中国铁道出版社,1994..
  • 7Purs.,BR 李培昆.隧道施工通风[J].隧道译丛,1990(11):7-10. 被引量:3

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部