摘要
南海的钻采平台由于受限于海上安装资源,目前一般采用分块建造和安装,这种形式的弊端之一,就是海上的连接和调试工作量大。中控系统作为联系平台各个部分的中枢,如何优化其系统布局,使建造和调试工作尽量在陆地完成,最大限度地减少海上工作量和不确定性,是值得海洋工程建设领域关注的问题。该文以新建的陆丰13-2DPP平台为范例,对如何优化类似项目的中控系统设计提出了改进建议,供相关的设计、使用单位和系统集成商参考。
Due to the limition of the resources, the south china sea drilling platform's installation and construction are under divers block. One of the disadvantage is the connecting and debugging workload are huge. How to optimize the layout of the system is a question that worth the marine engineering construetion's attention. So that the construction and commissioning work can be done on the land. This paper take an example of the new LF13 - 2DPP. It gives us a suggestion of how to optimize the center control system and for the relevant desgin and the company and the system integrators.
出处
《工业仪表与自动化装置》
2012年第6期91-94,共4页
Industrial Instrumentation & Automation
关键词
钻采平台
分块建造
中控系统
海上连接调试
优化
drilling platform
block construction
center control system
marine connection debugging
optimization