摘要
介绍盐田港二期3个5万吨级集装箱码头结构的计算原则,基桩类型及其结构型式,沉桩控制标准及嵌岩桩、锚定桩、锚定嵌桩的施工机具和施工方法,还介绍了采用高应变动力试验与静载试验相结合的方法验证工程桩实际承载力的情况。
It introduces the calculation principle for the structures of three 50,000 dwtcontainer terminals of Yantian Port 2nd - phase Project, types of foundation piles and thestructural types, piling control standard, as well as the construction machinery and constructionmethod for embedded piles, anchor piles and embedded - anchor piles. It also gives an introduction to the actural bearing capacity testing by combining high - strain dynamic test withstatic load test.
作者
顾寄平
GU Ji - ping(The Third Investigation and Design Institute for Harbour Engineering, Shanghai 200032, China)
出处
《水运工程》
北大核心
2000年第5期19-25,共7页
Port & Waterway Engineering
关键词
盐田港二期集装箱码头
钢管桩
沉桩
嵌岩
锚定
Yantian Port 2nd-phase container terminal
steel pipe pile
piling
embedded into rocks
anchor