结合工程实例,介绍了斜拉索安装工况索力分析及相关参数,阐述了跨海斜拉桥斜拉索安装施工方案。
In combination with project case, cable tension analysis and relevant parameters of installation and construction condition of stayed - cable are introduced, and installation and construction scheme of stayed - cable of cross- sea stayed -cable bridge are elaborated.