油气输送管道顶管穿越公路施工设计 被引量:2

The Design of Jacking Pipe Crossing Highway in Construction of Oil & Gas Pipelines
下载PDF
导出
摘要 顶管穿越施工是在穿越铁路、高速公路、河流、建筑物等障碍物,或在城市公路主要干道路面下铺设时,常采用的一种特殊施工方法。它可以不拆除或少拆除地面障碍物,不中断地面交通;在穿越河流时既不影响正常通航,也不需要修建围堰或进行水下作业。文章介绍了顶管穿越施工前期准备以及顶管施工方法,针对顶管施工的质量保证和安全提出了相应的措施。 The construction of the jacking pipe through the railways、highways、fivers、buildings and other obstacles, or the laying of the main roads of the urban road pavement, oiten be used as a special construction method. It can be used without or less removal of ground obstacles, without interrupting the ground transportation; neither affecting normal navigation through the fiver, without building cofferdams or underwater operations, The article describes the preparation of construction of the jacking pipe and the method for jacking pipe construction, it also proposals the corresponding measures to protect the quality assurance and safety of the construction.
出处 《工程建设与设计》 2013年第1期157-159,共3页 Construction & Design for Engineering
关键词 顶管 穿越 施工 设计 工艺管道 jackingpipe crossing construction design process piping
  • 相关文献

参考文献5

二级参考文献4

  • 1测量规范[S].GBG50026-93.北京:中国建筑工业出版杜.1993.
  • 2公路路基施工技术规范[S].JTGF10-2006.北京:中国建筑工业出版杜,2006.
  • 3GB50424-2007,油气输送管道穿越工程施工规范[S].
  • 4GB50423-2007,油气输送管道穿越工程设计规范[S].

共引文献6

同被引文献1

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部