期刊文献+

谈国际EPC工程项目设计管理的组织与控制 被引量:8

Organizing and Controlling the Engineering Management of International EPC Projects
下载PDF
导出
摘要 在国际EPC工程总承包模式日益流行的形势下,我国传统的建筑施工企业越来越多地参与国际工程总承包市场的竞争。论文探讨了施工实力强而设计能力弱的EPC总承包企业通过加强设计管理来弥补自身不足的问题,阐明了设计管理的特点、实施与控制,以及设计管理对EPC总承包商的现实意义。 In the popular situation of EPC General Contracting mode to the international projects, more and more traditional construction companies in our country take part in the competitive world market for obtaining the projects by general contract. In thi s chapter, the questiuns o f EPC General Contractors with good constructing strangth but weak designing ability smooth their weaknesses through increasing engineering management arc approached, the characteristics of the engineering management, how to carry out, control the engineering management, are expounded, and the practical significances for (he engineering management to the EPC General Contractors are also clarified.
作者 欧阳姣凤
出处 《工程建设与设计》 2013年第1期185-189,共5页 Construction & Design for Engineering
关键词 国际工程 EPC总承包 设计管理 international projects EPC General Contract engineering management
  • 相关文献

参考文献3

共引文献60

同被引文献31

引证文献8

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部