新洲河受到人类工程影响,原有的水文测验方案不再适用。详细叙述了新的流量测验技术方案,结果表明其是合理的。
The Xinzhou River has been affected by engineering projects and the original test scheme is no longer used.The new flow test scheme is expounded and the result shows that it is reasonable.