广东珠三角地区天然气调峰电源建设模式分析 被引量:1

Analysis on Construction Mode for Peak-Regulation Natural Gas Power Plant in Guangdong Pearl River Delta Region
下载PDF
导出
摘要 广东珠三角地区电力需求、调峰需求旺盛,受制于环境容量、土地资源等影响因素,区内常规火电建设受限,作为天然气电源,具有建设周期短、易深入负荷中心、节能环保效益明显等优点,是珠三角区域内理想的电源建设类型。笔者分析了广东珠三角地区建设天然气调峰电源的必要性,同时针对区域内资源、环境等特点,对珠三角地区天然气调峰电源的建设模式进行了分析,提出了"厂站合一"的推荐模式,并给出了相关建议。 With the rapid economy expansion and urbanization, the power load demand increases rapidly in Guangdong Pearl River Delta Region, however, the conventional thermal power plants are restricted by the envi- ronmental capacity, land resources and other factors. Under the circumstance, the natural gas power plant is an ideal solution for Pearl River Delta Region due to its short construction period, its location and its energy con- servation and environmental protection benefit. The paper makes an analysis on the constlnlction necessity and mode of natural gas power plant and also gi.ves some advices for the recommended mode of "integrated structure of power plant and substation" based on the unique source and environment of this region.
作者 刘云 李勇
出处 《红水河》 2012年第6期43-46,共4页 Hongshui River
关键词 厂站合一 天然气发电 电网调峰 integrated structure of power plant and substation nature gas for power generation peak regulationof power grid
  • 相关文献

参考文献5

二级参考文献17

共引文献77

同被引文献8

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部