摘要 天生桥一级水电站大坝为钢筋混凝土面板堆石坝,大坝于1999年年底完成施工,2000年11月完成竣工验收。大坝自首次蓄水运行至今,面板发生过表面裂缝、面板挤压破坏、面板脱空等现象,现将缺陷处理措施、维护管理经验进行简略介绍。通过采取合理整改措施,保证了大坝安全运行。 A reinforced concrete face rockfill dam was built for Tianshengqiao first cascade hydropower station, which was completed at the end of 1999 and passed through the completion acceptance in November 2000. The safe operation of dam is guaranteed by taking reasonable corrective measures although there are surface cracks, extrusion failures and cavities etc. at the concrete reservoir. The paper makes a brief introduction to and management. face slab since the initial water impoundment in Tianshengqiao the defect treatment measures and experiences on maintenance
作者 胡召根
出处 《红水河》 2012年第6期130-133,共4页 Hongshui River
关键词 混凝土面板堆石坝 缺陷处理 缺陷原因分析 面板破损 天生桥一级水电站 concrete face rockfill dam defect treatment defect cause analysis damage of face slab Tian-shengqiao hydropower station
  • 相关文献

参考文献1

二级参考文献2

共引文献7

同被引文献4

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部