浅析核电总包项目设计信息管理——接口管理 被引量:6

Analysis for Application of Design Information Management in Nuclear EPC-Interface Management
下载PDF
导出
摘要 介绍了如何利用接口控制手册(ICM)对设计接口进行优化管理,分析了在多项目总承包情况下设计接口存在的风险,并针对这类风险提出了合理的应对措施。 In this thesis, the method how to utilize the ICM to optimize the design interface manage- ment is introduced. Moreover, the potential risks of the design interface management under the condition with multi-project general contracting are analyzed. Subsequently, to evade the very risks, the reasonable measures are proposed as well.
出处 《核安全》 2012年第3期60-65,共6页 Nuclear Safety
关键词 设计接口 接口控制手册(ICM) 信息化 design interface Interface Control Manual (ICM) informatization
  • 相关文献

参考文献5

二级参考文献5

  • 1许民.安装配合土建工程施工界面的技术管理[J].建筑管理现代化,2005,19(6):61-63. 被引量:15
  • 2T.C.Pavitt,A.G.F.Gibb.Interface Management within Construction:In Particular,Building Facade[J].Journal of construction Engineering and Management,2003,(2):8 ~15.
  • 3Weng Tat Chan,Chuan Chen,John I.Messner etal.Interface Management for China's Build-Operate-Transfer Projects[J].Journal of construction Engineering and Management,2005,(6):645 ~ 655.
  • 4David K.H.Chua,Myriam Godinot.Use of a WBS Matrix to Improve Interface Management in Projects[J].Journal of construction Engineering and Management,2006,(1):67~79.
  • 5程振廷.城市轨道交通建设的接口体系[J].城市轨道交通研究,2003,6(6):35-40. 被引量:10

共引文献15

同被引文献33

引证文献6

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部