期刊文献+

基于重力坝三维设计的CAD动态交互系统开发 被引量:3

Development of CAD dynamic interaction system for gravity dam based on 3D design
下载PDF
导出
摘要 为了在可研阶段合理、快速地制定重力坝设计方案,减少设计周期和成本,采用极限状态设计的方法,利用VB 6.0可视化编程工具开发出了一套能够与CAD动态交互的重力坝三维设计系统。该系统通过对Auto-CAD的二次开发实现了重力坝的三维参数化建模,并对所建三维模型进行结构计算,将设计与计算紧密结合,通过动态交互简化了大量复杂数据的计算,达到精确、快速完成断面设计的目的。经实践检验证明,该系统大大提高了断面设计效率,实用性强,对可研阶段的方案比选具有重大意义。 In order to make a design scheme reasonably and fast,as well as reduce the design cycle and cost in the feasibility study stage of gravity dam,this paper developed a 3D-CAD dynamic interaction design system with VB 6.0,based on the limit state design method.The system would produce 3D parametric models of gravity dam and fulfill the structural analysis.Data exchange would happen between the system and AutoCAD by dynamic interaction during the analytical process,which achieved the goal of accurate and fast dam design.In practice it has proved that the system greatly improves the efficiency of the section design and is practical strong.In brief,the system has a great significance to gravity dam design scheme selection in the feasibility study stage.
出处 《计算机应用研究》 CSCD 北大核心 2013年第1期165-168,175,共5页 Application Research of Computers
基金 国家创新研究群体科学基金资助项目(51021004)
关键词 重力坝 三维设计 CAD 动态交互 系统开发 gravity dam 3-dimensional design CAD dynamic interaction system development
  • 相关文献

参考文献6

二级参考文献18

  • 1李长江,陆萍,魏磊磊.大型复杂结构件的三维建模和试验仿真[J].锻压装备与制造技术,2004,39(6):95-97. 被引量:4
  • 2何朝明,邱向东,李柏林,刘瑞晓,程永明.300m级高拱坝设计与施工三维可视化仿真研究[J].水力发电,2006,32(3):24-26. 被引量:6
  • 3YANG H HUANG 包承纲等(译).土坡稳定分析[M].北京:清华大学出版社,1988..
  • 4.SL203-97.水工建筑物抗震设计规范[S].,..
  • 5Avi Wiezel, Ali Erhan Oztemir.. The Influence of Design Methods on Construction Productivity [ J]. Construction Research. 2003.
  • 6Dr. Greg Jensen C, Jared D Haslam, Jennifer A Hoeh, et al. Project based computer-aided engineering applications, 30th ASEE/IEEE Frontiers in Education Conference F2E-20. Kansas City, MO.October 18- 21,2000.
  • 7DUShi-hong,QINQi-min,WANG Qiao,et al.Evaluating structuraland topological consistency of complex regions with broad boundariesin multi-resolution spatial databases[].Information Sciences:anInternational Journal.2008
  • 8Gao J X,Manson B M,Kyratsis P.Implementation of concurrent engineering in the suppliers to the automotive industry[].Journal of Materials.2000
  • 9Chen Shi-jie,Li Lin.Decomposition of interdependent task group for concurrent engineering[].Computers and Industrial Engineering.2003
  • 10Bidarra R,Bronsvoort W F.Semantic feature modeling[].Computer Aided Design.2000

共引文献62

同被引文献35

引证文献3

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部