摘要
对皖电东送淮南至上海特高压交流输电示范工程一般线路工程17B标段灌注桩基础承台浇筑各个工序的控制提出了具体要求,并对承台基础的成品保护提出了建议,能够对类似工程的灌注桩基础施工有所借鉴。
The paper puts forward specific requirements to 17B bid section potting pile cushion cap for Huainan to Shanghai UHV AC transmission demonstration project, and proposes some suggestions to cap foundation' s product protection, it has reference to the pile foundation construction of the similar projects.
出处
《青海电力》
2012年第4期43-45,共3页
Qinghai Electric Power
关键词
特高压
灌注桩
承台
施工方法
UHV
potting pile cushion
cap