摘要
结合镇江市拆迁安置房工程建设的实际经验,讨论了工程中遇到的造价控制和工程质量控制的问题,给出了设计阶段造价控制的相关措施与施工阶段质量控制的"两重点、三原则、四手段"要点。
Combining with the factual experience for the make-shift engineering construction of Zhenjiang,the paper discusses the cost control and engineering quality control for the projects,and provides the relative measures of the cost control at the design stage and the key points for the quality control at the construction stage with"two key points,three principles,and four measures".
出处
《山西建筑》
2013年第3期236-236,共1页
Shanxi Architecture
关键词
安置房建设
造价控制
质量控制
construction of make-shift
cost control
quality control