摘要
介绍了AP1000钢制安全壳用CV钢板监造活动各阶段的主要内容和工作重点。通过制定完整、规范的文件,采取切实可行的监造模式和质量控制措施,能够顺利、高效的完成核电用CV钢板的监造工作。
Main contents and key points at each stage of supervision activity for AP1000 nuclear power steel-made containment CV steel plate have been introduced. By establishing complete and normative documents and adopting applicable supervision mode and quality control measures, the supervision job for nuclear power CV steel plate could be implemented soundly and efficiently.
出处
《中国重型装备》
2012年第4期48-50,共3页
CHINA HEAVY EQUIPMENT