摘要 蜀河水电站在工程建设过程中以提高水电站整体经济效益为目标,把造价管理作为工程建设的一个关键环节,在全面推行招投标制、优选承包商的同时,理顺内部管理体制,加强合同管理,减少合同纠纷,有效控制了工程造价,保证了工程质量和工期。 During construction of Shuhe Hydropower Station, improvement of the whole macroeconomic benefit of the Station is taken as a goal and cost contral of the engineering construction is considered as one key point. The internal management system is smoothened an contract management is strengthened so that contract disputes are decreased, engineering cost is controlled effectively and the project quality & construction period are assured while the tendering-bidding system is fully implemented and preferable contractors are chosen.
作者 谢崇文
出处 《西北水电》 2012年第6期97-100,共4页 Northwest Hydropower
关键词 水电站 优化设计 招投标制 合同管理 造价控制 hydropower station optimizing design tendering-bidding system contract management cost control
  • 相关文献

参考文献6

二级参考文献10

共引文献65

同被引文献3

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部