建筑废料现场管理多目标优化决策分析 被引量:2

Study on Model of Multi-Objective Optimization of Construction Waste Field Management
下载PDF
导出
摘要 为了研究建筑废料现场管理的优化决策问题,在明确废料现场管理有效性最大化、成本最小化和时间最小化三大目标的基础上,设计了废料管理多目标优化模型框架,建立了相应的数学模型,应用多目标遗传算法NSGA-II对模型进行求解,并借助MATLAB工具进行算法编程。通过实例应用分析,找出了各种资源因素的最佳组合方式,决策者可根据实际项目对成本、时间和废料管理有效性的要求,以及项目自身特点和资源条件,选择最为合适的废料现场管理方案。 To achieve the optimization of decision-making of construction waste field management system,a framework for multi-objective optimization of waste management is developed considering three objectives,which are effectiveness,cost and time.A model is solved by multi-objective genetic algorithm NSGA-II.An application example is analyzed according to practical requirements and conditions,to illustrate the use of the model and to demonstrate its capabilities in generation and visualizing optimization among waste management effectiveness,cost and time.
出处 《土木工程与管理学报》 2012年第4期110-116,共7页 Journal of Civil Engineering and Management
基金 上海市重点学科建设项目(B310)
关键词 建筑废料 现场管理 多目标优化 遗传算法 construction waste field management multi-objective optimization genetic algorithm
  • 相关文献

参考文献8

  • 1Lu M, Poon C S, Wong L C. Application framework for mapping and simulation of waste handling processes in construction [ J ]. Journal of Construction Engineering and Management, 2006, 132 ( 11 ) : 1212 - 1221.
  • 2Chandrakanthi M, Ruwanpura J Y. Optimization of the waste management for construction projects using simulation [ J ]. Winter Simulation Conference Proceedings, 2002, (2): 1771-1777.
  • 3袁永博,阮宏博,王星凯.基于遗传算法的项目工期成本质量综合优化[J].四川建筑科学研究,2008,34(3):227-230. 被引量:14
  • 4袁永博,李丹.基于遗传算法的建设工程风险决策多目标优化研究[J].四川建筑科学研究,2010,36(1):261-265. 被引量:4
  • 5Poon C S, Yu A T W, Ng L H. On-site sorting of construction and demolition waste in Hong Kong[ J]. Resources, Conservation and Recycling, 2001, 32:157-172.
  • 6Wang J, Touran A, Christoforou C, et al. A Systems Analysis Tool tbr Construction and Demolition Wastes Management[ C ]// Proceedings of the 13th International Conference on Solid Waste Technology and Management,2002: 432-444.
  • 7ShenL Y, TamW Y V, ChanC W S, et al. An examination on the waste management practice in the local construction site[J]. Hong Kong Surveyor, 2002,13(1) :39-48.
  • 8王家远,袁红平.基于系统动力学的建筑废料分类分拣管理模型[J].科技进步与对策,2008,25(10):74-78. 被引量:8

二级参考文献18

  • 1SHENL.Y.,吴宇哲,CHANE.H.W.,HAOJ.L..Application of system dynamics for assessment of sustainable performance of construction projects[J].Journal of Zhejiang University-Science A(Applied Physics & Engineering),2005,6(4):339-349. 被引量:10
  • 2杨耀红,汪应洛,王能民.工程项目工期成本质量模糊均衡优化研究[J].系统工程理论与实践,2006,26(7):112-117. 被引量:55
  • 3王孟钧,彭彪,陈辉华.基于系统动力学的建筑市场信用系统[J].系统工程理论方法应用,2006,15(5):409-411. 被引量:14
  • 4Deb K,Aarawal S,Pratap A,et al. A fast elitist nondominated sorting genetic algorithm for multi-objective optimization: NSGA-Ⅱ[A]. Proc of the Parallel Problem Solving from Nature Ⅵ Conf [ C]. Paria, 2000 : 849-858.
  • 5Daisy X M Zheng S. Thomas Ng and Mohan M Kumaraswamy. Applying Pareto Ranking and Niche Formation to Genetic Algorithm- Based Multi-objective Time-Cost Optimization. Journal of Construction Engineering and Management, 2005,131 ( 1 ) : 81-91.
  • 6Kalyanmoy Deb. A Fast and Elitist Multi-objective Genetic Algorithm : NSGA- Ⅱ. IEEE Transactions on Evolutionary Computation, 2002,6 (2) : 182-197.
  • 7Seung H Hart, Du Y Kim, Hyungkwan Kim, Won-Suk Jang. A web-based integrated system for international project risk management [J]. Automation in Construction,2007,17:342-356.
  • 8冯利军,李书全.效用理论在工程项目风险管理决策中的应用[J].山西建筑,2007,33(26):14-15. 被引量:1
  • 9Babu A J, GSuresh Nalina. Project management with time, cost, and quality considerations [ J ]. European Journal of Operational Research, 1996,88 ( 2 ) : 320-327.
  • 10El-Rayes Khaled, Kandil Amr. Time-Cost-Quality trade - off analysis for highway construction[J]. Journal of Construction Engineering and Management,2005, 131 (4) :477-486.

共引文献23

同被引文献3

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部