摘要
介绍南京禄口机场航站楼续建工程的电气设计,指出配电、照明、线路敷设、楼宇管理、消防联动以及防雷接地等设计的要点,强调施工过程中各专业协调的必要性。
On the basis of electrical design in the Second Phase project of the terminal building of Nanjing Lukou airport, the paper lists key points in design of power distribution, lighting,wiring and cabling,building management,firefighting interlock, lightning-proof grounding,etc. ,and emphasizes the necessity of coordination between different disciplines in the construction process.
出处
《硫磷设计与粉体工程》
2000年第3期44-46,共3页
Sulphur Phosphorus & Bulk Materials Handling Related Engineering
关键词
供电
配电系统
照明
民航建设
设计
电气设计
power supply,power distribution system,lighting,civil aviation,construction,design summary