摘要
鹤岗鸟山矿井工程施工中应用冬季砼多合剂电热法综合施工新工艺,费用低、质量好、速度快,解决了以往传统冬季施工方法费用高、质量难以保证、施工速度慢的难题。
With the characteristics of low cost, good quality and rapid speed, a new technique of concrete tom prehensive construction in winter with multi--agent and electro--thermal method is adopted in the engineering construction of Niaoshan Colliery in Hegang, which solves the problems of high cost, poor quality and slow con- struction speed in traditional construction methods.
出处
《江西煤炭科技》
2013年第1期86-87,共2页
Jiangxi Coal Science & Technology
关键词
冬期砼施工
多合剂与电热法综合施工
新工艺
concrete construction in winter
new technique of comprehensive construction with multi--agent andelectro-- thermal method