摘要
介绍焦化厂在1号150t/h干熄焦装置实施的锅炉排污水余热回收改造内容,通过将干熄焦锅炉排污水的热量用于预热锅炉给水,可以提高给水温度10℃左右。
The transformation for recovery of waste heat of sewage of boiler applied for NO.1 CDQ de- vice of 150 t/h in Coking Plant were introduced, and the feed-water temperature can be increased about 10℃ by supplying heat quantity of sewage of CDQ boiler to the preheating boiler.
出处
《柳钢科技》
2013年第1期26-27,30,共3页
关键词
锅炉排污水
余热回收
干熄焦
Sewage of Boiler
Recovery of Waste Heat
CDQ