摘要 为了提高洞室底板及边墙抗冲耐磨性能,在其表面浇筑40 cm厚的HFC40高强度混凝土,介绍了该种混凝土的特性、施工程序、方法、工艺,并针对施工过程中遇到的泌水、离析、坍落度损失较快等问题,提出了改进措施。 For improving the performance of shock and abrasion resistance of the baseboard and side-wall of the cavern, a layer of HFC40 high-strength concrete with 40 cm thickness is poured on its surface. The characteristics and the con- strnction program, method and technology of this type concrete are introduced. Some improved measurements for the possible problems of bleeding, segregation and quick loss of slump occurred during the construction process are presen- ted.
作者 田师海
出处 《水电与新能源》 2013年第1期40-42,共3页 Hydropower and New Energy
关键词 HFC40混凝土 延迟静置预缩 施工措施 质量控制 HFC40 concrete delayed standing pre-shrinking construction measurement quality control
  • 相关文献

同被引文献10

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部