摘要
中核集团三门核电站一号机组作为全球首台在建的第三代AP1000核电机组,其监理具有重要意义。本文通过对三门一号机组反应堆压力容器、稳压器、堆芯补水箱等核岛设备制造监理过程中发现的典型质量问题进行研究分析,从实际做好核岛设备监理工作,为后续AP1000核岛设备国内制造及监理提供借鉴和参考。
Unit 1 of CNNC Sanmen Nuclear Power Plant is the first global third generation AP1000 Nuclear Power Plant in building. Therefore, its manufacturing supervision has special significance. Briefly analyzing the quality problems discovered in manufacturing supervision of reactor pressure vessel, pressurize and core makeup tank NI equipments, this article provides reference to the subsequent manufacturing supervision of NI equipments for AP1000 Nuclear Island made in Mainland.
出处
《设备监理》
2013年第1期40-43,共4页
Plant Engineering Consultants
关键词
三门核电站
AP1000核电机组
核岛设备
制造监理
质量问题
Sanmen Nuclear Power Plant, AP1000, nuclear island equipment,manufacturing surveillance, quality problem