变电运行倒闸操作顺序分析 被引量:6

Analysis of Switching Operation Sequence in Substation
下载PDF
导出
摘要 通过包头地区电网变电运行实例,分析了常规变电站单出线停、送电,主变压器低压侧及双电源变电站倒电源等的倒闸操作顺序,对可能由于操作顺序引发的带负荷拉隔离开关的操作提出优化操作方案;对500 kV3/2接线方式的变电站3/2断路器、母线侧断路器及中间断路器接线方式的倒闸操作顺序进行了关键点和危险点分析和探讨,提出了优化合理的操作步骤。为规范变电运行倒闸操作顺序,减少误操作提供经验。 According to operation examples of Baotou power grid substation, the author made an analysis of the single wire power off or power transmission in Conventional Substation, and switching sequence of switching operation in LV side of main transformer and dual power substation power. Put forward an optimization proposal for substation misoperation by error sequence of operations. For 3/2 connection mode substation, analyzes the key points and dangerous points of switching sequence in middle circuit breaker and bus side circuit breaker. Finally, the author presented an optimization proposal for switching sequence to regularize the substation switching sequence and prevent misoperation.
作者 杨智睿
机构地区 包头供电局
出处 《内蒙古电力技术》 2012年第6期113-117,共5页 Inner Mongolia Electric Power
关键词 变电运行 倒闸操作 操作顺序 500 KV变电站 3 2断路器 substation operation switching operation switching sequence 500 kV substation 3/2 circuit breaker
  • 相关文献

参考文献3

二级参考文献2

  • 1广西电力工业局高级培训教材编委会.电气设备及其运行(一次部分)[M].北京:中国水利水电出版社,1998.
  • 2江苏省电力工业局.变电运行技能培训教材(500kV变电所部分)[M].北京:中国电力出版社,1999.

共引文献2