摘要
新疆索尔库都克铜钼矿采矿经历了从井下开采至露天开采的转变,矿山中后期的生产还将经历从露井联采至井下开采的过渡。根据矿床生产发展现状,阐述了采矿设计与实践不同阶段中存在的安全、技术、生产组织等问题,并对不同阶段矿山应充分重视和关注的问题进行了分析和探讨,对该矿及其它同类矿山的生产有所指导。
Mining of Suoerkuduke Copper-Molybdenum Mine in Xinjiang Uygur Autonomous Region has been changed from underground to open-pit, and the mine production will be transferred from combined mining of open- pit and underground into underground mining during the late phase. According to the present situation of production and development in the mine, the problems on safety, technologies and production organization existing in different phases of mining design and practice are described, and the problems that should be given full attention and concerns during different phases are analyzed and discussed. The design can he guidance to the production of this mine and other similar mines.
出处
《有色金属(矿山部分)》
2013年第1期16-19,共4页
NONFERROUS METALS(Mining Section)
关键词
采矿设计
露井联采
实践
mining design
combined mining of open-pit and underground
practice