建设工程项目经理执业能力指标体系构建 被引量:6

Research on Professional Competency System of Construction Project Manager
下载PDF
导出
摘要 建设工程项目经理执业能力水平是目前制约项目绩效提升的关键因素。本文在现有国内外项目经理执业能力指标研究和实践的基础上,首先利用探索性因素分析对测量指标进行筛选,得出适用于我国现阶段的建设工程项目经理执业能力指标体系。然后,用验证性因素分析验证了指标体系的有效性。研究结果显示,项目经理的执业能力指标分为项目管理技能、群体关系能力、领导力、职业提升能力4个因素,每个因素的因素负荷量都大于0.75,很好地反映了项目经理的执业能力,进一步的研究表明研究结果具有良好的解释度。 At present,the professional competency of the construction project manager is a key factor in restricting project performance improvement. On the basis of the research and practice of existing domestic and international project manager competence indicators, firstly, this paper uses Exploratory Factor Analysis(EFA) to select the potential compe- tence indicators so as to get the competence indicators system for construction project manager which applies to the pres- ent stage in China. And then, this paper uses Confirmatory Factor Analysis(CFA) to verify the validity of the compe- tence indicators system. The results show that the project manager' s competence can be divided into four factors that are project management skills, interpersonal skills, leadership skills and the ability to enhance the profession. The factor loading of each factor is above 0.75, indicating that the factors can well reflect the project manager' s competence indicators. And the forward research indicates it also has a good explanation.
出处 《预测》 CSSCI 北大核心 2013年第1期72-76,共5页 Forecasting
基金 国家自然科学基金青年资助项目(71001078 71202010)
关键词 建设工程项目经理 因子分析 执业能力指标 construction project manager factor analysis professional competence
  • 相关文献

参考文献14

  • 1Papke-Shields K E, Beise C, Quan J. Do project managers practice what they preach, and does it matter to project suc- cess [ J ]. international Journal of Project Management, 2010, 28(7) : 650-662.
  • 2徐慧玲.国际工程总承包项目经理胜任力研究[D].徐州:中国矿业大学,2006.
  • 3Turner J R, Muller R. The project manager' s leadership style as success factor on projects: a literature review [J]. Project Management Journal, 2005, 35: 49-61.
  • 4Cliff T B, Vandenbosch M B. Project complexity and efforts to reduce product development cycle time [ J ]. Journal of Business Research, 1999, 45(2) : 187-195.
  • 5Dainty A R J, Cheng M I, Moore D R. A competency- based performance model for construction project managers [J]. Construction Management and Economics, 2004, 22 ( 8 ) : 877- 886.
  • 6Ahadzie D R, Proverbs D G. Towards developing compe- tency-based measures for project managers in mass house building projects in developing countries[ J]. Construction Management and Economics, 2009, 27(1 ): 89-102.
  • 7Silvius A J G, Batenburg R. Future development of pro- ject management eompetences [ A ]. Proceedings of the 42nd Hawaii International Conference on System Sciences [C]. Hawaii, 2009. 1-10.
  • 8黄静,汪小金.建筑施工项目经理能力与素质的实证分析[J].四川建筑科学研究,2006,32(5):217-220. 被引量:6
  • 9Reise S P, Waller N G, Comery A L. Factor analysis and scale revision [ J ]. Psychological Assessment, 2000, 12 ( 3 ) : 287-297.
  • 10Motowidlo S J, Van Scotter J R. Evidence that task performance should be distinguished from contextual per- ormance [ J]. Journal of Applied Psychology, 1994, 79 (4) : 475- 480.

二级参考文献16

  • 1Cooper C. L. and Cartwright, S. (1994).Healthy Mind, Healthy Organization - A proactive Approach to Occupational Stress, Human Relations, 47,4, 455-471.
  • 2Cohen, S. and Wills, T. A. (1985). Stress, Social Support, and the Buffering Hypotheses, Psychological Bulletin, 98,310-57.
  • 3Lloyd, C. and King, R. (2001). Work-related Stress and Occupational Therapy, Occupational Therapy Inter national, 8, 4,227-243.
  • 4Munz, Kohler, Greenberg (2001). Effectiveness of a Comprehensive Worksite Stress Management Program:Combining Organizational and Individual Inter ventions,International Journal of Stress Management, 8,1,49--62.
  • 5Leung, M. Y. (2004). And Lain C. Y. (2004)Coping Behavior of Construction Estimators in Stress Management, Engineering, Construction and Architectural Management.
  • 6Leung, M. Y. and Wong, M. K. (2004). Coping Behavior of Congstruction Estimators in Stress MAnagenment, Engineering, Construction and Architectural Management.
  • 7Wong, M.K. (2003) A Multidimensional Approach to the Study of Coping Behaviors of Cost Estimators, Final Year Project, City University of Hong Kong.
  • 8Wong, O.Y., (2004) Organizational Stress Management For Optimizing Estimators" Performance,Final Year Project, City University of Hong Kong.
  • 9Turner J R.The handbook of Project-Based Management[M].McGraw-Hill,London,1993.
  • 10Frame.J.Managing Projects in Organizations[M].Jossey-Bass,San Francisco,CA,1995.

共引文献257

同被引文献120

引证文献6

二级引证文献46

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部