期刊文献+

水库移民安置实施综合设代工作实践——以亭子口水利枢纽工程为例 被引量:6

Practice of design representation in reservoir resettlement of large hydropower projects: case of Tingzikou Hydro-junction project
下载PDF
导出
摘要 大中型水利水电工程建设征地移民综合设代工作,对于保障移民安置的顺利实施具有重要作用。新移民条例颁布实施后,移民综合设代在大中型水利水电工程建设征地安置实施中将逐步得到开展,但其相关工作实践经验仍较为缺乏。根据亭子口水利枢纽工程的移民综合设代工作实践,阐述了移民工程综合设代的概念、工作任务和内容,梳理了综合设代工作流程、工作深度要求和实施要点。 Applying design representation in reservoir resettlement has significant meanings on ensuring the smooth implement of resettlement. After the implementation of new reservoir resettlement rules, the institution of comprehensive resettlement design representation will be applied and promoted stage by stage, but still there is a shortage of relevant practical experiences. Combi- ning with the practical case of Tingzikou Hydro - junction, we demonstrate the concepts and necessity of resettlement design rep- resentation, while discuss the content, work procedure, work extent and key points during the implementation.
出处 《人民长江》 北大核心 2013年第2期34-37,共4页 Yangtze River
关键词 移民安置 建设征地 综合设代 亭子口水利枢纽 resettlement land requisition comprehensive design representation Tingzikou Hydro -!unctio_n_ .__ ]
  • 相关文献

同被引文献11

引证文献6

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部