缅甸伊江上游水电开发移民安置规划探索 被引量:3

Discussion on immigrant resettlement for hydropower development of upper Irrawaddy River in Burma
下载PDF
导出
摘要 伊江(伊洛瓦底江)上游水电开发项目是近年来我国与缅甸共同投资开发建设的大型水电项目。由于缅甸水电开发、建设起步较晚,移民安置法律、法规不完善,缺乏安置政策及补偿标准等,对移民安置规划工作带来了一定的困难。通过现场调查与分析,梳理了当地建设征地的基本情况,总结了实际工作中的一些特殊问题,参照世行、亚行等国际上通行的非自愿移民政策以及我国移民安置工作经验,对缅甸水电工程移民安置规划提出了一些对策和建议。 The hydropower development project in the upper Irrawaddy River is jointly invested and developed by China and Burma. Due to late start of hydropower development in Burma, imperfect resettlement laws and regulations, lack of resettlement policies and compensation standards, the resettlement planning was facing some difficulties. Through field investigation and anal- ysis, the land requisition condition in the local area and some special problems encountered in practical work are summarized. By using the international practice and experience of involuntary resettlement, including the relevant policies of World Bank and Asi- an Development Bank, and resettlement experience in China, some countermeasures and suggestions on resettlement planning of hydropower development in Burma are put forward.
出处 《人民长江》 北大核心 2013年第2期46-48,53,共4页 Yangtze River
关键词 水电开发 非自愿移民 移民安置规划 密松水电站 其培水电站 伊洛瓦底江 缅甸 vhydropower development involuntary resettlement resettlement planning Misong Hydropower Station Qipei Hy-dropower Station Irrawaddy River Burma
  • 相关文献

参考文献3

  • 1长江水利委员会长江勘测规划设计研究院.缅甸伊洛瓦底江密支那以上流域水资源开发利用规划报告[R]武汉:长江水利委员会长江勘测规划设计研究院,2007.
  • 2长江勘测规划设计研究有限责任公司.伊江上游水电项目密松水电站可行性研究报告[R]武汉:长江勘测规划设计研究有限责任公司,2009.
  • 3世界银行.世界银行业务手册OP4.12业务政策——非自愿移民12业务政策——非自愿移民[R].世界银行,2001.

同被引文献16

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部