期刊文献+

水利工程建设征地企事业单位补偿评估问题探讨 被引量:4

Several issues on compensation assessment of institution and enterprises in land acquisition of hydropower project construction
下载PDF
导出
摘要 水利水电工程建设征地涉及的企事业单位多,因其行业类型不同,规模各异,因此在进行补偿费用测算时疑难点较多。从"原标准、原规模或恢复原功能"的原则出发,对企事业单位补偿评估中出现的停产停工损失、存货资产数量核定和评估指标,以及设备补偿中搬迁、变现处理等过程中存在的问题,借鉴财务及资产评估等专业知识进行分析,提出契合水利水电工程建设征地实践的企事业单位补偿评估测算指标。 A large number of different types and different scales of enterprises and institutions are involved in land acquisition for hydropower project construction, which brings about various difficulties in compensation budget estimation. Under the princi- ples of the original standard, scale or original function restoration, the losses induced by production suspension in the process of compensation assessment, inventory asset check and assessment indicators for enterprises and institutions, as well as the problems existed in equipment transport compensation and asset realization are analyzed by the professional knowledge of the financial and asset assessment. In addition, evaluation indicators of compensation assessment of enterprises suited for hydropower project con- struction land acquisition are also proposed.
出处 《人民长江》 北大核心 2013年第2期72-74,共3页 Yangtze River
关键词 建设征地 补偿评估 水库移民 水利水电工程 land acquisition for construction compensation budget assessment reservoir resettlement hydropower project
  • 相关文献

同被引文献11

引证文献4

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部