摘要
结合工程实例,对公路立交桥下穿多股道复杂车站实施过程中站场过渡设计方案特点、原则及步骤进行了分析,在确保行车和设备安全运输畅通的前提下,提出了分阶段、多步骤实施的过渡方案,为铁路设计人员对复杂站场施工过渡设计提供参考。
Combining with the engineering example, this paper analyzed the design scheme features, principles and steps of station transition in road overpass underneath pass complex station implementation process, in ensuring travelling and equipments safe transportation, proposed phased, many step implementation transition plan, provided reference for the design of complex station field construction to railway designers.
出处
《山西建筑》
2013年第5期129-131,共3页
Shanxi Architecture
关键词
下穿
站场
过渡方案
underneath pass, station, transition scheme