摘要
根据放射性建筑物在退役阶段的工作任务提出了退役的需求,分析了放射性建筑物应提前为日后的退役考虑的几类重要因素,对退役实际案例进行了总结,为其他放射性建筑物退役工程提供了指导。
According to the tasks for radioactive buildings at the retirement, the paper points out the demands for the retirement, analyzes some important factors for the buildings after their retirement, and sums up their retirement cases, so as to provide the direction for the retirement of other radioactive buildings in future.
出处
《山西建筑》
2013年第5期194-195,共2页
Shanxi Architecture
关键词
放射性建筑物
退役因素
退役工程
radioactive building, retirement factors, retirement project