1WISE M R,ARMENTOR R J,CHEVRON. Screenlesscompletions as a viable through-tubing sand control comple*tion.[SPE 107440][R].2007.652-659.
2GHURAIRI FA,SOLARES R,BARTKO K. Resultsfrom a field trial using new additives for fracture conductivityenhancement in a high-gas screenless completion in the JaufReservoir.[SPE 98088,][R].2006.850-859.
3ELLIS V R,CORMIER G,ADAMS G. Fracturing forsand control:screenless completion in the Yegua formation.[SPE 96289,][R].2005.950-958.
4CHANG X J,CHEN R B,LUBIS W. Screenless frac-packcompletions-case studies from Jidong fields.[SPE 108909][R].2008.765-774.
5ACOCK A,NORBERT A,CARACAS H. Screenlessmethods to control sand[J].Oilfield Review,2003,(03):38-53.