期刊文献+

重钢新区1^#、2^#高炉合理喷煤实践 被引量:4

RATIONAL PCI PRACTICE ON 1^# AND 2^# BF IN CISC NEW DISTRICT
下载PDF
导出
摘要 高炉喷煤的合理与否,既要考虑煤的喷吹条件,也要考虑高炉炉况的影响。2011年重钢新区1#、2#高炉一方面抓技术措施以改善喷煤条件,另一方面加强操作以确保高炉炉况的稳定顺行,进而提高其利用系数,在满足煤比限制性条件的前提下进行合理喷吹,1~9月份取得了较好的喷吹效果。 The PCI is reasonable or not, not only to consider the coal injection condition, also to consider the BF status. In 2011, 1^# and 2^# BF in CISC new district, coal injection conditions, and strengthening the operation to ensure BF utilization coefficient and making reasonable injection under taking technical measures to improve BF status stability, further, improving meeting restrictive conditions, had achieved good blowing effect from January to September.
出处 《四川冶金》 CAS 2012年第4期26-30,共5页 Sichuan Metallurgy
关键词 合理 喷煤 限制性条件 rational, PCI, restrictive conditions
  • 相关文献

参考文献3

  • 1刘秉铎.鞍钢高炉喷吹煤粉合理喷吹参数的探讨[J]辽宁冶金,1985(03):27.
  • 2周传典.高炉炼铁生产技术手册[M]北京:冶金工业出版社,2003317.
  • 3成兰伯.高炉炼铁工艺及计算[M]北京:冶金工业出版社,1991325-328.

同被引文献13

引证文献4

二级引证文献6