期刊文献+

膨胀加强带代替后浇带在超长混凝土结构施工中的应用

The Application of Expansion Reinforcing Strip Instead of Back Strip Used in the Overlong Concrete Structure Construction
下载PDF
导出
摘要 文章以京沪高铁南京南站北广场工程为例,针对传统后浇带施工中存在的一系列问题,对膨胀加强带代替后浇带的基本原理及施工工艺作了论述,阐明超长混凝土结构采用膨胀加强带是一项有效加快工程进度和降低施工成本的技术措施。 Based on the project from north square, Nanjing south railway station, Beijing-Shanghai high-speed rail line, and according to a series of problems of traditional back strip in the construction, discuss the basic principle and construction technology used by expansion reinforcing strip instead of back strip, illustrate that it is technical measures to speed up the construction progress and reduce the construction cost used by expansion reinforcing strip.
作者 曹国祥
出处 《泰州职业技术学院学报》 2012年第6期98-101,共4页 Journal of Taizhou Polytechnic College
关键词 混凝土裂缝 后浇带 膨胀加强带 施工工艺 concrete cracks back strip expansion reinforcing strip construction technology
  • 相关文献

参考文献3

  • 1王铁梦.建筑物裂缝控制[M]北京:中国建筑工业出版社,1997.
  • 2江正荣;朱国梁.简明施工计算手册[M]北京:中国建筑工业出版社,1999.
  • 3王庆春;柳春圃.建筑施工常用数据手册[M]北京:中国建筑工业出版社,2001.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部