摘要
介绍新钢6 m焦炉装煤除尘系统的基本工艺,指出该系统存在问题,提出改进措施,满足了生产要求。
The basic process of coal charging de - dusting system is introduced at 6 m coke oven in Xinyu steel. The existing problems are indicated, and improving measures is put forward, the result meets the requirements of process and production.
出处
《江西冶金》
2012年第6期12-14,共3页
Jiangxi Metallurgy
关键词
焦炉
装煤除尘系统
干法除尘
气密性
coke oven
coal de - dusting system
dry dust collection
tightness