摘要
某沿海国际机场驱鸟造地,场道地基填土,地质条件比较复杂,有古河道穿过,根据要求堆载顶面标高精度高,误差小等特点,阐明了在吹砂过程中应进行沉降观测。
The geological condition of a coastal international airport is complex with a fossil fiver course. It demands the pile load section with high precision and low errors. The settlement observation should be performed during grit blasting process.
出处
《林业科技情报》
2012年第4期117-119,共3页
Forestry Science and Technology Information
关键词
地基填土
堆载预压
沉降观测
filling soil
preloading
settlement observation