期刊文献+

上海浦东国际机场T1候机楼水系统设备评估

Evaluation of water system of the T1 terminal of Shanghai Pudong International Airport
下载PDF
导出
摘要 水系统在上海浦东国际机场T1候机楼能源保障系统中具有极为重要的作用。为保证2010年上海世博会期间T1候机楼水系统设备的正常运行,结合现场调研对T1候机楼水系统进行了评估,重点研究了T1候机楼水系统的组成、设备的特性、运行状况及运载能力;通过与原始设计资料进行对比与分析,探讨系统运行状况是否满足设计要求、现状要求和未来需求。与此同时,评估主要设备使用寿命,阐述设备系统存在的不足与缺陷,为浦东机场T1候机楼水系统设备未来的维护、更新及改造提供参考。 Water system plays crucial role in the energy guarantee system for the T1 terminal of Shanghai Pudong International Airport. In order to ensure the operation of the water system of the T1 terminal during the 2010 Shanghai Expo, the water system was evaluated. This evaluation focused on the composition of the water system and the characteristics, current operation situation, and loading capacity of the equipments; through the comparison between original design and current situation, this evaluation also discussed whether the current system could meet the design requirement, current requirement, and future task. This evaluation mainly tested the lifetime and explained the existing deficiencies of the equipments. This paper would provide references to the maintenance, upgrading, and reconstruction of the Pudong Interntaional Airport T1 terminal in the future.
出处 《给水排水》 CSCD 北大核心 2013年第2期110-115,共6页 Water & Wastewater Engineering
基金 上海国际机场股份有限公司科技专项(2010237127) 上海浦东威立雅有限公司科研项目(20122450270)
关键词 给水系统 热水系统 排水系统 设备评估 候机楼 2010上海世博会 Water supply system Hot water supply system Water drainage system Equipment evaluation Terminal 2010 Shanghai EXPO
  • 相关文献

参考文献2

二级参考文献2

共引文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部