在机械施工中合理运用实物法确定工程造价是根据施工机械的实际生产效率,结合工程实际情况计算出来的。因此总体上能体现工程造价。
Reasonably using the object method to define the engineering cost in the machinery construction, which is calculated according to real productivity of construction machinery combining the real circumstances of engineering. Therefore it can truly embody the project cost in the overall.