期刊文献+

盘区下向充填分层道稳定性数值模拟 被引量:5

Numerical simulation on stability of slicing drift of panel underhand cutting and filling
下载PDF
导出
摘要 龙首矿采用下向水平分层六角形进路充填采矿法,分层道是关键通道,其稳定性至关重要。应用FLAC3D软件建立了分层道及六角形进路数值模型,应用强度等效原则确定了分层道底部配筋充填体的力学参数。分别研究了分层道假顶为素充填体和配筋充填体情况下的稳定性。结果表明,分层道开挖暴露的大面积矩形薄板,最大挠曲在中部位置,破坏方式从中部开始拉断破坏,应在开采过程中加强对顶板的支护及对中部位置的监测。此外,分层道假顶为素充填体时不利于矿山的安全生产,尤其在进路与分层道交叉巷道处,应加密配筋密度,防止出现冒落及掉块现象。 The underhand cutting and filling method with hexagon access was adopted in Longshou mine where the slicing drift is the critical path and its stability is very important.The numerical model of the slicing drift and hexagon access is built by the FLAC 3D software.The mechanical parameters of the reinforcement filling body at the bottom of slicing drift were settled through the application of the equivalent strength principle.With the artificial roof of the slicing drift either as ordinary filling body or as reinforcement filling body,their stabilities were respectively studied.The analytical results showed that the maximum deflection occurs in the central position of the exposed thin rectangular board when the slicing drift is excavated.And the fracture which is a tensile failure starts at the central position,so in the process of excavation the support of the roof and the monitoring of the central position should be strengthened.Besides,when the artificial roof of slicing drift is ordinary filling body,it will be harmful to the mine's safety production.Especially in the junction of slicing drift and access higher reinforcement density is needed,because the rock is prone to fall down.
出处 《黄金》 CAS 2013年第1期29-34,共6页 Gold
基金 国家自然科学基金项目(No.51164016)
关键词 下向水平分层 六角形进路 充填采矿法 分层道 强度等效原则 配筋充填体 underhand horizontal slice hexagon access cut and fill mining method slicing drift equivalent strength principle reinforcement filling body
  • 相关文献

参考文献13

二级参考文献20

  • 1蔡美峰.地应力测量原理和方法的评述[J].岩石力学与工程学报,1993,12(3):275-283. 被引量:71
  • 2蔡美峰,乔兰,于劲波.空心包体应变计测量精度问题[J].岩土工程学报,1994,16(6):15-20. 被引量:29
  • 3Cai M,Int J Rock Mech Min Sci,1995年,32卷,4期,735页
  • 4蔡美峰,岩土工程学报,1994年,16卷,5期,15页
  • 5蔡美峰,岩石力学与工程学报,1993年,12卷,3期,275页
  • 6Kiger S A, Getchell J V, Slawson T R, et al, Vulnerability of shallow-buried fiat-roof .structures, Parts: 1 - 6[R]. USA: Engineer Waterways Experiment Station of USA Army, 1984.
  • 7Qian Q H, Fang Q. Two important problems on defining loads and on dynamic analysis to shallow-buried structures[A], in: Proc. of Int.Symp. on Unique Underground Structures[C]. Denver, CO, USA:[s.n.], 1990. 100-115.
  • 8Krauthammer T A. Assadi L, Shanna H M. Analysis of impulsively loaded reinforced concrete elements-theory[J]. Computers and Structures, 1993, 48(5): 851-860.
  • 9Krauthammer T A. Assadi L, Shanna H M. Analysis of impulsively loaded reinforced concrete elements- Ⅱ implementation[J]. Computers and Structures, 1993, 48(5):861 - 871.
  • 10Krauthammer T, Bazeos N, Holmquist T J. Modified SDOF analysis of RC box-type structures[J]. Journal of Structural Engineering, 1986,112(4): 726 - 744.

共引文献138

同被引文献129

引证文献5

二级引证文献13