临近既有线深基坑开挖施工 被引量:3

Deep Pit Excavation near the Existing Line
下载PDF
导出
摘要 临近既有线深基坑开挖施工必须采取必要的防护措施确保既有线行车安全。以钱江铁路新桥南引桥为例,该工程基坑采用拉森Ⅳ型钢板桩进行防护,建立计算模型采用"理正深基坑5.3支护软件"检算,并从基坑开挖开始到回填验交为止定时监测位移,以确保既有线行车安全。 Necessary protective measures must be taken for the deep pit excavation construction near the existing line to ensure the safety of the existing line.This paper takes the south approach bridge of the new Qiantang River railway bridge as example.The project adopts the Ⅳ type of Larsen steel sheet pile as protection.A computational model by using the "rationale for deep foundation 5.3 supporting protection software" is established for checking,and timely monitoring of the horizontal displacement of the protecting piles to ensure the traffic safety of the existing line from the beginning of the pit excavation to the backfill acceptance check.
出处 《铁道建筑技术》 2012年第12期60-63,94,共5页 Railway Construction Technology
关键词 既有线 深基坑 钢板桩 防护 existing line deep pit steel sheet pile protection
  • 相关文献

同被引文献7

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部