本文首先研究了施工前临时用电的规划和管理,然后分析了施工图纸的交付和图纸会审工作和建立质量管理制度和管理体系的工作,讨论了施工阶段的管理工作包含了哪些方面的内容,最后讨论了交工验收的管理。
This paper studies the planning and management of temporary electricity in the pre-construction stage, then analyzes the delivery of construction drawings and drawings reviewing work and the establishment of quality management system and management system, discusses the contents of management in construction phase, finally, discusses the management of the acceptance.
出处
《价值工程》
2013年第4期77-79,共3页
Value Engineering
关键词
大型化工项目
电气施工管理
large-scale chemical projects
electrical construction management