新建涂装生产线总承包项目进度控制优化措施 被引量:2

Schedule Control and Optimization Measures for General Contracting Project of New Building Coating Production Line
下载PDF
导出
摘要 大中型建设工程总包项目成功建设和尽早投入使用的关键在于总包单位的项目管理水平和项目控制能力。对于利润日趋微薄的微车行业,投产时间很大程度影响建设单位的市场经营效益,其中涂装生产线的建设进度决定着整体汽车工厂投产进度。本文根据参与的总包长安公司新建微车涂装生产线工程项目,总结微车涂装生产线工程项目进度管理特点及在满足要求工程质量和费用的前提下,如何优化项目进度控制。 The key of success construction and early put into operation for large- or medium-scale EPC projects is on the general contractor project management and control abilily. For the mini-car industry of which prnfil is much more meager ,lay by ,lay, operation time of new prnduclion line greatly influences the market operating efficiency of the owner, in which the paint line construction progress determines the whole atttomobile factory production schedule. In this paper, the project progress management characteristics and nplimization of project progress control were summarized so as to meet with the requirements of the engineering quality and project costs of mini-car paint production line according to the involvement of Chang'an company new mini-car paint line construction.
作者 姚茂娟
出处 《现代涂料与涂装》 CAS 2013年第1期61-63,66,共4页 Modern Paint & Finishing
关键词 涂装生产线 进度管理 优化项目进度控制 paint production line progress management optimization of project progress conlrol
  • 相关文献

参考文献2

二级参考文献5

共引文献11

同被引文献5

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部