摘要 高炉喷煤的合理与否,既要考虑煤的喷吹条件,也要考虑高炉炉况的影响。2011年重钢新区1#、2#高炉一方面抓技术措施以改善喷煤条件,另一方面加强操作以确保高炉炉况的稳定顺行,进而提高其利用系数,在满足煤比限制性条件的前提下进行合理喷吹,l~9月份取得了较好的喷吹效果。 The PCI is reasonable or not, not only to consider the coal injection condition, also to consider the BF status. In 2011, 1# and 2# BF in CISC new district, technical measures were applied to improve coal injection conditions, and to strengthen the operation to ensure stability of BF, moreover, BF utilization coefficient were improved to make reasonable injection under the restrictive conditions, good blowing effect had been achieved from January to September.
作者 杨玻 刘鹏
出处 《重钢技术》 2012年第4期1-8,共8页 CISC Technology
关键词 合理喷煤限制性条件 rational PCI restrictive conditions